A trench doesn’t care about your title. On this day in 2022, it took a project manager — a guy who probably thought the danger was for the crew in the hole, not for him. The dirt doesn’t read org charts. Here’s what happened, and the rule written in soil and blood.
On This Day in Safety — June 24, 2022 · McKinney, TX
At a residential construction site north of Dallas, a project manager went into an unprotected trench and didn’t come out. The walls came in on him.
OSHA’s investigation found the contractor, Bandera Utility Contractors Inc., willfully left the crew exposed: no protective system in the trench — no box, no shoring, no proper sloping. The ladder they had was damaged and didn’t extend the required three feet above the landing. And nobody was inspecting the excavation at the start of each shift the way the rules demand. OSHA proposed $165,952 in penalties.
Here’s the translation to the floor. A single cubic yard of soil weighs around 2,700 pounds — about the weight of a small pickup. When a wall lets go, it happens in under a second. You don’t get pulled out in time; you can’t expand your chest to breathe under that load. That’s why the rule exists.
The rule is 29 CFR 1926 Subpart P — Excavations: a trench 5 feet or deeper needs a protective system — slope it back, shield it with a trench box, or shore it — unless it’s solid rock. A safe way out within 25 feet of every worker in a trench 4 feet or deeper, with the ladder extending 3 feet above the edge. And a competent person inspects the excavation before every shift, and again after rain, with the authority to pull people out.
This wasn’t a freak event. It was every box on the checklist, left unchecked.
Trending Now
Trench collapses remain one of OSHA’s most aggressively enforced hazards — fatalities in excavation work have repeatedly triggered willful and even criminal referrals, not just fines. For safety leaders: if your crews touch excavation at all, your competent-person program and your “no protection, no entry” rule are the two things an inspector will test first.
Fail of the Day
A crew “just needed thirty seconds” in a 6-foot trench to fix a coupling — the box was sitting on the truck, felt like overkill for half a minute. The wall sloughed and pinned a worker to the knees; it took the crew twenty minutes to dig him out by hand. He walked away. The lesson isn’t “he got careless” — it’s that the box being a 10-minute setup made “just thirty seconds” feel reasonable. Make the safe way the fast way: the box goes in the hole before anyone does, every time, no judgment call required.
Got a fail or a near-miss? Hit reply. We’ll feature it anonymously — no names, no company, no blame. Just the lesson, so the next crew doesn’t learn it the hard way.
Do This One Thing
Before anyone enters a trench today: box, slope, or shore — ladder within 25 feet — competent person has walked it this shift. If you can’t say yes to all three, nobody goes in.
Please stay Safe & Hydrated!!!